A lot of progress took place in February and March at our Torres project. After deconstruction was complete, work began on the remodel of the home.

IMG_0490


The existing roof was prepped for the addition of a sun deck.

SONY DSC


Notice something missing from the living room? We removed the large, stone fireplace from the living room and added windows which open the room up to the deck overlooking the trees and adjacent open space. A new, smaller fireplace will be added to the space.

SONY DSC


Excavation for the new bathroom at the lower level. This will be the future location of the steam shower.

SONY DSC


Another view of the excavation at the lower level of the home. The crew will be adding a new retaining wall to create an added bathroom, mechanical room, and laundry at the lower level.