There was a lot of progress on our Lobos Ridge project in April and May! Much of the steel has arrived and has been installed on site and the framework is up on the 1st level of the home.

SONY DSC


View from the third level of the home.

SONY DSC


View from the second level of the home, looking up to the third and fourth levels.

SONY DSC


Looking up towards the kitchen on the third level of the home from the second level.

SONY DSC


View from the front of the home, the garage is already framed in as well as the stairs to the second level.

SONY DSC


Much of the framing has been constructed on the lower level of the home. The lower level contains a garage, mechanical closet, storage, and elevator and stairway to the upper levels of the home.

SONY DSC


View of the garage from the stairway leading up to the second level.

SONY DSC


What a great view from the future pool terrace!