The plumbing and wiring continue to be installed at our Carmel Valley Residence. Additional footings in the main house have been poured and the framing for the master bedroom, library, and kitchen has been built.

SONY DSC


View of the home from the future driveway taken at the beginning of June.

SONY DSC


On the lower level of the home, temporary bracing for the garage door header has been built. Eventually, these supports will be removed and a new garage door will be installed.

SONY DSC


Installation of electrical conduit has started in the garage area.  In the photo above, you can see the playroom and elevator taken from the entrance to the garage.

SONY DSC


Steel framing for the elevator that will take visitors from the lower level to the main level has been built.

SONY DSC


Towards the end of June, the steel on the lower level was installed and reinforcing bar was installed for the concrete slab in the garage.

SONY DSC


View of the lower level steel from the main level of the home looking towards the garage.

SONY DSC


At the beginning of the month, the footings were poured in the library, master bedroom and dining room. Above is a shot of the home taken near the kitchen looking east towards the library and master suite.

SONY DSC


Towards the end of June, the walls for the master bedroom, master bathroom and library were built. Above is a shot down the hall taken from the entry of the home. The master bedroom and bathroom are on the left and the library is on the right; beyond is the future dining room and living room which will have glass walls to take advantage of the great view of Carmel Valley!

SONY DSC


The living room of the home was designed to slightly cantilever over the lover floor.