This month at our Lobos Views home in Carmel, more steel was installed on the second level of the home and steel work began on the third level.

SONY DSC


Above is a view of the west facade of the home looking towards the patio on the second level and the entry on the third level. The large opening shown on the left will be large, glass sliders that will lead into a guest bedroom on the second level from an outdoor patio. On the right-hand side of the photo, you can see that grading for the stairway to the third level and entry to the home has begun.

SONY DSC


Above is another view of the work beginning on the stairway to the entry on the third level of the home.

SONY DSC


On the third level, the structural steel was installed. Above is a photo taken from the kitchen looking west towards the dining room and living room.

SONY DSC


Here is another photo from the same spot, facing south toward the den, BBQ patio and entry of the home.

SONY DSC


Steel has been installed on the forth level of the home as well. The fourth floor of the home will be a master suite including a master bedroom, closet, bathroom, and office.

Advertisements