A lot has happened during the first week of August at our Lobos Views home! HVAC and electrical systems are being installed, framing on the main living level on the third floor of the home is underway, work is continuing on the pool, and the steel frame is up to the roof of the fourth level of the home-which will house the master suite.

SONY DSC


Work continues on the stairway to the main entry of the home on the third level.

SONY DSC


In the photo above, the stairway to the entryway is shown on the right. To the left of the tree, you can see the cantilevered living room and second level of the home.

SONY DSC


In the garage and on level 2, electrical conduit and light fixtures are being installed for the home.

SONY DSC


Above, workers stand on the future patio off the fourth floor master suite.

SONY DSC


Another view of the fourth floor of the home. Wow, what a gorgeous view!

SONY DSC


Above, you can see that plumbing is being installed at the pool.