Our Torres project is almost complete! In July, we finished the wood floor installation, finished building the steam shower on the lower level of the home and installed the kitchen cabinets.

Torres_Image4


Above is a view from the dining room looking towards the living room.


Remember when there was a huge fireplace in this spot?

Photo_46


The fireplace was replaced with a large window which lets so much more light in and makes the space feel more open and airy. A new, more efficient gas fireplace was added to the far wall of the living room (on the right-hand side in the photo above) and a slider was added to separate the living room from a remodeled, outdoor patio.

Torres_Image5


Reclaimed teak floors were installed in July as well complete with radiant heating beneath.

M4H04600.MP4


The IKEA kitchen cabinets were re-used from the initial remodel back at the beginning of this year along with many of the appliances.

M4H04378.MP4


On the lower level of the home, the cement was poured for the floor in the guest bathroom steam shower.

M4H04412.MP4


The tile work and board formed concrete was completed in July as well. Don’t the anodized aluminum windows look great against the white tile from Waterworks?

M4H04604.MP4


In the master bathroom, the tub and tub filler from the initial remodel of the home was re-used. A new, open shower was installed in the master bath. You can see the flush floor drain in the far right of this photo.


We look forward to sharing the completed project!