One last update on our Carmel Valley Residence before the holiday season!


The rough framing at the main house and guest house is almost complete and work continues on the electrical and plumbing work throughout the home. The stairway to the entry is ready to pour and the tubing for the radiant flooring has been installed.

SONY DSC


Above is a photo of the site looking towards the garage/lower level and front of the home.

SONY DSC


Above is a photo taken in April of this year from roughly the same spot on site, looking directly at the lower level of the home. For reference, Mary Ann is walking through the garage of the home.

SONY DSC


The stairway to the entry of the home is prepped and ready to pour. Above, you can see the reinforcing bar and formwork in place. Also, you can see the roof of the lower level of the home to the right of the stairway. Eventually, this roof will be a green roof planted with drought-resistant plants.

SONY DSC


Additional framing has been added to the fireplace that was recently installed.

SONY DSC


The tubing has been installed for the radiant heating throughout the home as well


We can’t wait to show you more photos of this project in the new year!