The windows and doors of the home are almost all installed, the exterior stone is nearly complete and the drywall throughout the home is being installed.

SONY DSC


Above is a view of the exterior of the home taken on one of our most recent site visits. The exterior stone from Exquisite Surfaces is almost completely installed and looks great. The next step is adding the grout to the finished sections of stone. You can also see the cedar siding being added to the cantilevered portion of the house.

SONY DSC


Above is another view of the front of the home. As you can see, the grout has already been added to some sections of the installed stone.

Lobos Views 2


Recently, Mary Ann and Sara, the interior designer for the project, met with our Boffi rep on site to finalize all of the kitchen finishes. Above, you can see the cabinet, counter top and flooring finishes for the space laid out. We cannot wait to see the final installed product!

IMG_0939


Inside the home, nearly all of the drywall has been installed. Above is a view from the kitchen into the living room. The large sliding doors open onto a patio area which overlooks the ocean. A large skylight in the center of the room also brings natural light into the space.

IMG_0938


Above, the den off the kitchen serves as a storage place for the drywall while it is being installed.

SONY DSC


On the fourth level of the home, work continues on the outdoor fireplace and pool area off the master suite.

SONY DSC


Windows and doors on the fourth level of the home have been installed as well. The shot above was taken from the roof of the fourth level looking towards the master bedroom. The entire corner of the master bedroom opens up onto the patio beyond which overlooks the ocean.