We have made a lot of progress at our Corona Road residence in the Carmel Highlands in the past month!

The foundation for the lower floor is complete and work is starting on the lower-floor framework.

IMG_1601


Above is a view of the site looking along the driveway towards the home’s future entry.

IMG_1592


Workers continue to make progress on the lower floor framework.

5


Above, is a view from the future green roof deck off the master suite. Such a gorgeous view!

8


The progress on the lower floor of the home framed in for the step-down dining room above.

IMG_1506


The future skylight well can be seen to the left as workers place joist hangers for the floor framing.

IMG_1508


Above, you can see the lower level has been back-filled at the concrete wall with crushed rock over a drainage mat.

IMG_1513


A beautiful view of Pebble Beach in the distance with the master suite floor framing underway.