Our Lobos Views project is really progressing! We cannot wait to see the finished home later this summer! In the next few months, we will give you a sneak peak at the interior furnishings going into the home also!

SONY DSC

SONY DSC


The cedar paneling on the exterior of the home has been installed, the stonework is complete and work is continuing on the tile installation at the spill wall on the far right in the photo above.

SONY DSC


In the photo above, you can see the main entrance to the home on the third level. We love that you can see the ocean from the front door!

SONY DSC


All of the doors and windows have been installed and the exterior and interior stone work is complete. Above is a view taken from the patio off the living and dining room on the third level. On the far left of the photo, you can see the doors that lead from the two third level bedrooms out on to the patio.

SONY DSC


The interior stone in the den on the third level looks great!

SONY DSC


In the lanai on the fourth level, we were able to create a great indoor/outdoor space by installing pocket/sliding doors that stack out of the way. The recessed tracks for these doors really add to the seamless indoor/outdoor feeling of the space.

SONY DSC


The flooring throughout the home is starting to be installed. Throughout the second level, we selected porcelain tiles that resembles wood.

SONY DSC


What a great view from the patio off the master suite!