Our Corona Road home is making a lot of progress! Julie Paulson, the project architect, was on site today and took some great progress photos. The roof is currently being installed on the caretaker’s unit, concrete forms were pulled off of the garage this week, and the walls are currently being ground down to prepare for the waterproofing installation.

IMG_1875


Above is a view from the front of the gallery wall looking towards the caretaker’s unit.

IMG_1872


Above is a photo taken from inside the garage, looking towards the main house.

IMG_1873


In the photo above, you can see the four-car garage in the distance and the future master bath in the foreground.

IMG_1898


Above is another view of the four-car garage. Eventually, the ground surrounding the garage on this side will be flush with the top of the roof line and planted, creating a green roof.